Fresh Gear for the Summer | Shop the Collection

CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing

SKU #: 2022119002

local-shipping
Free Shipping! US and Canada only
car

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution.

More details arrow-downward
Delivery estimate loading…
local-shipping
For International Shipping estimates, proceed to checkout to calculate.
Usually Ships Same or Next Business Day
Select Product Options for estimated delivery
  • expand-more Quick Facts
    • check Long-Lead Mini Fuse Bypass Switch
    • check Helps avoid having to remove and replace fuses when flat towing your vehicle
    • check Vehicle-specific application for a custom fit
    • check Integrates with CURT RV harness (sold separately)
    • check Includes bypass harness, fuse holder and other components
    • check Fuse not included
    • check 20-amp max
    • check One-year warranty
  • expand-more Specifications
    • check SKU: 2022119002
    • check Brand: Curtâ„¢
    • check Material Type: Thermoplastic Rubber
    • check Country of Origin: MEX
    • check Quantity In Package: 1
    • check Warranty Term: One-Year Limited Warranty
    • check Unit of Measure: EA
    • check Universal Part: No
    • check Manufacturer Reference Number: 58445
    • check UPC: 612314584451
    • check Shipping Dimensions: 9" L x 4" W x 2" H, 1 lbs.
expand-more

Product description

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.

FEATURES:

  • Helps avoid having to remove and replace fuses when flat towing your vehicle
  • Vehicle-specific application for a custom fit
  • Integrates with CURT RV harness (sold separately)
  • Includes bypass harness, fuse holder and other components
  • 20-amp max (fuse not included)
Warning:

Warning Cancer and reproductive harm. www.P65Warnings.ca.gov

expand-more

Support

support-agent

Support Documentation

Explore manuals, videos, FAQs and more associated with this product.

Learn More
Loading...